What are you looking for?

Turakurgan Combined Cycle Power Plant

Start Date: January 2017
Finish Date: April 2020
Project Equipments: Various number of manlift - 100 Ton to 200 Ton mobile crane - 400 Ton and 600Ton crawler crane
Project Details:  The project is located in the state of Nemengan, 280 km east of Tashkent, the capital of Uzbekistan. The plant has a total installed capacity of 900 MW and consists of two blocks (2 + 2 configuration) each with an installed capacity of 450 MW.