What are you looking for?

Aksu Wind Power Plant (RES) Turbine Installation

Start Date: 16.08.2018
Completion Date: 10.03.2019
Equipment used in the project: Liebherr LG1750 750t mobile crane, Liebherr LTM1500 500t mobile crane, Liebherr LTM1130-5.1 130t mobile crane, Demag AC200 200t mobile crane, 8x7, 4x3 and 6x1 axle Faymonville lowbed trailer
Project Description: The first installation of three 140 / 3500KW (100HH) wind turbines of Goldwind company, which is being constructed in the capacity increase project of AKSU wind power plant in Yahyalı district of Kayseri, was completed. The Liebherr LG1750 cage boom mobile crane was used with the SP SL8HS 105m + 6m configuration as the main crane for installation. The weight of the mounted rotor is 106 tons and the lifting height is 100m.