Precision Transport Solution with Blade Lifter Technology

Start Date: November 2025
End Date: November 2025
Equipment Used in the Project: Goldhofer FTV850 Blade Lifter, Liebherr LTM 1100 mobile crane, Liebherr LTM 1130 mobile crane 

Project Description: Advanced engineering calculations and Blade Lifter technology enabled the safe transport of 72.5-meter-long wind turbine blades over a 32 km route through narrow passages.

Three sets of wind turbine blades, each 27 tons in weight, were safely transported to the wind energy site. The blades were lifted onto the Goldhofer FTV850 Blade Lifter with Liebherr LTM 1100 and LTM 1130 mobile cranes and were transported smoothly for 32 km, performing precise maneuvers through narrow passages in the villages.